How long does it take for a 360Booth® to be installed? Three days, with training. We ship the studio to the spot five days prior. We fly in somebody from Tampa early Monday morning. They laser-level the track and install all the track and the flooring on Monday. Even by Monday night, they’re assembling the structure. Wednesday, it is completely done, with logos if you want them. There’s training, and then he’s back home.
It’s that easy. It takes three days to install a 360Booth®.